b'STEP 1 STEP 2 STEP 3Place the three sleeves in the lidUse the nuts/bolts/washers to fasten the sleeves onto lid Insert the weir onto the Base Holder where the predrilled were the pre drilled holes are visible. hole is visible.STEP 4Install the Inner Pipe Assembly to the base Also make sure the Main Inlet Pipe of the of the three sleeves using the unions ttedInner Pipe Assembly is tted to the side to the pipe end. hole in the main lid.STEP 5 STEP 6Connect the 50mm Union to the Inner The Outer Pipe Assembly consists of the2.)Ensure that thePipes Assembly main inlet pipe on the sideprimary inlet via the rotameter and theSecondary Inlet(Bypass) is tted to the of the lid secondary inlet via the bypass.pre-drilled bypass hole in the top of the 1.) Connect the primary inlet(Rotameter)Lid by using the Bypass extension pipe.onto the main inlet 50mm Union already tted to the lid.STEP 7 STEP 8Screw the Black Caps onto the three sleeves as wellFinally t the Lid Assembly onto the BaseFunnel as the cap on the lid. Remove the sleeve ( black caps) whenHolder.lling with the pellets by using the Funnel.) 172'